Paper Conference

Proceedings of BauSim Conference 2008: 2nd Conference of IBPSA-Germany and Austria

     

Energetische Sanierung am Flughafen Frankfurt auf der Basis von CBP Energy Refurbishment

Christian Dietl, Christian Franz, Thomas Steinwidder

Abstract: CBP Energy Refurbishment® stands for the strategic effected change of your assets to forward-looking, energy efficient real estates. Following the guiding idea of sustainability this optimization strategy helped to quantify a 46.1% cut in future primary energy demand for a 240.000sq lot at Frankfurt Airport Terminal 1, reducing annual carbon emissions by ~9.500 tons. This was accomplished by consequently using simulation tools in combination with a value engineering process, compiling further project goals and qualitative customer preferences to an integrated concept
Pages: 21 - 23
Paper:
bausim2008_21