Paper Conference

Proceedings of BauSim Conference 2012: 4th Conference of IBPSA-Germany and Austria

     

Anlageoptimierung der Neuen Monte Rosa-Hütte mittels Gebäudesimulation

Iwan Plüss, Urs-Peter Menti, Franz Sidler Franz, Samuel Fux, Lino Guzzella

Abstract: The New Monte Rosa Hut located just above Zer- matt/Switzerland is since two years in use. The oper- ation of energy generation and building services systems such as PV-panels, CHP-unit, heat store and sewage plant are continuously monitored. The data is stored for performance diagnostics and optimiza- tion. The Centre of Integrated Building Technology at the Lucerne University of Applied Sciences and Arts in cooperation with the Institute for dynamic systems and control at the ETH Zürich aim to itera- tively optimize the performance of the integrated building system. This paper presents the development and calibrating of a virtual building model using monitored data. The model can be used to provide answers to questions with regards to system sizing and cost optimization.
Pages: 162 - 166
Paper:
bausim2012_132