Conference Paper

Proceedings of eSim 2024: 13th Conference of IBPSA-Canada

     

Potential of cold climate air-source heat pump control strategies to mitigate the electrical demand of heating systems during high-demand periods in Canadian dwellings

Sarah Mollier, Laurence Rousseau, Justin Tamasauskas, Martin Kegel
CanmetENERGY / Natural Resources Canada

Abstract: Space heating electrification via heat pumps can increase house-level electrical demand. Electrical demand mitigation strategies can delay the heat pump operation giving more flexibility during electrical grid’s critical periods and allowing utilities to support greater adoption in Canada. Properly understanding the potential flexibility offered by heat pump systems, and assessing electrical demand mitigation strategies, is critical. Building simulation programs often use an hourly time step and focus on annual heat pump performance, neglecting short-term behaviours and impacts on electrical demand. To assess this flexibility potential, a simulation-based approach with a detailed cold-climate air-source heat pump (CCHP) model using a 2.5-min time step to represent key heat pump operational behaviours (e.g., defrost, start-up) is presented. For the analysis, a CCHP replaces a natural gas-based furnace in a two-storey house in Toronto. Four electrical demand mitigation profiles strategies are simulated and compared to two base cases, using various temperature setbacks/preheating profiles. The three main questions this paper is answering are: 1. How long can the HVAC electrical be delayed during defined periods critical for the grid. 2. How much will the HVAC electrical demand increase outside the defined peak periods. 3. How does the annual energy end-use and utility cost change with the mitigation profiles. Results highlight that, depending on the mitigation profile, HVAC electrical demand can be delayed from 30 minutes to 3 hours on the coldest day in Toronto. On the coldest ambient temperatures, the HVAC electrical demand is now occurring completely outside of the defined high-demand periods for one of the four mitigation profiles. The HVAC electrical demand increases by up to 8.5 kW mainly before the morning high demand periods. The annual energy end-use also increases ranging from 104 kWh to 312 kWh and the annual utility cost varies within $120 CDN.
Keywords: air-source heat pumps, electrification of space heating, mitigation strategies
Paper: